75 KW COMPRESSOR FAULT INVESTIGATION

Power quality monitoring used to investigate intermittent supply fuse operation and MCCB tripping on a 75 kW industrial compressor.

Manufacturing · Newcastle · Industrial support · Advanced fault finding

Fault condition showing sustained starting current before the MCCB trip

Customer need

An industrial manufacturing customer was experiencing an intermittent fault on a 75 kW compressor, causing blown supply fuses and MCCB tripping. The fault could not be reproduced during the initial callout, so further monitoring was required to capture the electrical conditions when the fault occurred.

What we did

  • Completed an initial electrical fault investigation.
  • Returned with a power quality analyser when the fault could not initially be replicated.
  • Captured the intermittent fault during motor startup and compared it with normal starting conditions.
  • Identified sustained high starting current for approximately 10 seconds before the MCCB tripped.
  • Discussed the results with the compressor manufacturer, identifying the load/unload valve for further inspection.

How it helped

Capturing the fault provided evidence that was unavailable during the initial inspection. Comparing normal and fault starts narrowed the issue to abnormal load during startup and gave the compressor manufacturer useful information for assessing the suspected load/unload valve fault.