Actual Intralec projects: the sector, what we did and where.
Projects
Industry
Service area

Maitland rural property solar, battery & backup
What we didInstalled 13.2 kW of Australian-made Tindo Walara solar panels, a 10 kW three-phase Fronius hybrid inverter and a 15.8 kWh Fronius Reserva battery, with whole-property backup.
How it helpedThe finished system provides solar generation, battery storage, power monitoring and backup in one installation, while keeping the equipment contained within the available shed space.
Read the project
Solar & 3 phase whole house backup
What we didInstalled 13.2kW of Australian made Tindo solar panels with a Fronius GEN24 10kW hybrid inverter and 15.8kWh Fronius Reserva battery.
How it helpedAfter six months, grid electricity use was practically eliminated, with self-sufficiency sitting between 90% and 96%.
Read the project
Mine site pump VSD & control system
What we didDesigned and built the VSD and control system, including the control panel, programming and electrical documentation.
How it helpedThe equipment passed introduction to site without delay and operated for the duration of the project without issue.
Read the project
Lighting control system upgrade
What we didInstalled a new C-Bus Wiser controller and touchscreen interface.
How it helpedThe upgraded system restored reliable lighting control throughout the facility while giving onsite staff the ability to make simple schedule and operational changes without relying on contractors.
Read the project
Commercial carpark LED lighting upgrade
What we didCompleted an LED lighting design using the existing poles and cabling.
How it helpedImproved the lighting across the carpark and resolved the recurring circuit trips that had been causing call-outs.
Read the project
75 kW compressor fault investigation
What we didCaptured the intermittent fault during motor startup and compared it with normal starting conditions.
How it helpedCapturing the fault provided evidence that was unavailable during the initial inspection.
Read the project
Mine site pump control systems
What we didDesigned and built two identical pump control systems.
How it helpedThe mobile skid and plug-in supply simplified transport, setup and connection onsite.
Read the project
Temporary generator connection for planned Ausgrid outage
What we didThe generator was connected before the outage began, with mains power restored once Ausgrid’s planned network upgrades were complete.
How it helpedProvided temporary power during the planned Ausgrid outage, reducing the time the facility was without power.
Read the project
Mixer genset main circuit breaker replacement
What we didUrgently sourced and installed a replacement MCCB.
How it helpedThe fast repair allowed production to continue with minimal downtime.
Read the project
Newcastle architectural renovation and extension
What we didCreated a functional switching layout in collaboration with the owners and the architect.
How it helpedThe lighting and switching were planned around how the owners use the home, giving them practical control over the different spaces.
Read the project
Newcastle house rewire and electrical fit out
What we didRe-wired all parts necessary to bring house up to current safety standards.
How it helpedOutlets, switches and light fittings were aligned with the tiles, joinery and skirting, finished to the standard of the rest of the build.
Read the project
Newcastle home architectural renovation
What we didInstalled quality light fittings throughout renovated portion of house.
How it helpedDimmable lighting throughout the renovated rooms, installed to the same standard as the rest of the renovation.
Read the project
Newcastle extension and second level addition
What we didWorked with the builder through the staged renovation, installing new circuits, lighting, power, ceiling fans and the owners’ vintage and Art Deco light fittings.
How it helpedThe staged approach allowed the electrical work to progress alongside the building works, with existing and new electrical services managed as different sections of the renovation were completed.
Read the project
Newcastle architectural build
What we didFull power and light fit out.
How it helpedBy taking a flexible approach and emphasising ongoing communication, we were able to adapt to all necessary changes and offer cost saving options wherever possible throughout the build process.
Read the project
Solar system replacement & upgrade
What we didInstalled a Fronius inverter and Australian-made Tindo panels.
How it helpedThe new system increased output from approximately 1.6 kW to 3.4 kW while using a similar roof area.
Read the project
IDEC PLC & HMI upgrade
What we didConverted and updated the existing FC3A PLC program for the FC6A platform.
How it helpedThe upgrade replaced an unsupported PLC while retaining and updating the existing rotomoulding machine controls.
Read the project
Generator harmonic distortion investigation
What we didAnalysed harmonic distortion within the generator-connected electrical system.
How it helpedWhile the cause of the intermittent generator fault was not pinpointed, the investigation confirmed that harmonic distortion was within acceptable limits.
Read the project
Industrial machine electrical & thermal inspection
What we didUsed thermal imaging to assess heat patterns across the electric motors.
How it helpedThermal imaging provided a fast and efficient way to identify heat patterns requiring further investigation.
Read the project
Manufacturing facility amenities power supply
What we didInstalled an additional 60 m of underground conduit and a new pit, and hauled more than 160 m of cable to supply the buildings.
How it helpedThe final connection was completed at the end of shift, limiting the power outage to less than 30 minutes.
Read the project