Project overview
TEMPORARY GENERATOR CONNECTION FOR PLANNED AUSGRID OUTAGE
Intralec coordinated a temporary generator connection for a manufacturing facility during a planned Ausgrid outage, keeping site interruption to a minimum.

What we did
The generator was connected before the outage began, with mains power restored once Ausgrid’s planned network upgrades were complete.
How it helped
Provided temporary power during the planned Ausgrid outage, reducing the time the facility was without power.

Related services
Related projects
All projects ↗︎
Mine site pump VSD & control system
What we didDesigned and built the VSD and control system, including the control panel, programming and electrical documentation.
How it helpedThe equipment passed introduction to site without delay and operated for the duration of the project without issue.
Read the project
75 kW compressor fault investigation
What we didCaptured the intermittent fault during motor startup and compared it with normal starting conditions.
How it helpedCapturing the fault provided evidence that was unavailable during the initial inspection.
Read the project
Mine site pump control systems
What we didDesigned and built two identical pump control systems.
How it helpedThe mobile skid and plug-in supply simplified transport, setup and connection onsite.